SIGNAGES

Reconciliation Room Sign - Sis. Bubop will take charge of ordering the wooden background from the original fabricator.

Prodigal Son Frame by Rembrandt - a photo/reprint will be placed at the other face of the wall.


DOOR KNOBS AND LIGHTING FIXTURES

Said items will be purchased and installed by Engr. Fred Tadeo on Saturday, November 10, 2007. He will be accompanied by Arch. Velerie Ibay in order to ensure that the specifications of the said items will be in accordance with the plans and drawings.

AIRCON SUPPLY AND INSTALLATION

Engr. Ernie Gayomali of Penta Planners, the contractor for the supply and installation of an aircon unit at the Reconciliation Room reported that the unit has already been installed. The drain host will be embedded to the wall by Tadeo Engineering Networks.

PRIEST AND PENITENT CHAIR

Focolare submitted a quotation for the above items which is higher than that of the canvass made by Arch. Ibay at SM. It was recommended that said items be purchased at SM. The electrical mechanism or platform will only be for the penitent's chair. The priest chair shall no longer have an electrical mechanism or platform. Instead, the light indicator for the priest door shall run parallel to the lights of the Reconciliation Room.


JOB COMPLETION
Engr. Fred Tadeo of Tadeo Engineering Networks, the contractor for the Reconciliation Room, reported that he expects to finish and turn-over the project by the Saturday, November 10, 2007. The job completion certification will be approved and signed by Arch. Ibay before the committee releases the final payment.